Maintenance

How to reset the product for power cut or forcible de-energizing
The setting of the product will be retained as it was before a power cut or de-energizing.
The output condition is also basically recovered to that before a power cut or de-energizing, but may change
depending on the operating environment. Therefore, check the safety of the whole facility before operating the
product.
If the facility is under accurate control, wait until it has warmed up. (Approximate 20 to 30 minutes)
Mounting regulator
●Cut the power supply to the Pressure switch when assembling. Also, turn the set pressure of the regulator to
zero.
●Mount O-ring to the O-ring groove of the regulator. Attention should be taken not to damage the O-ring.
●Set the adapter with 2 set screws.
Recommended tightening torque:
●Mount the main body of the Pressure switch.
●Insert the lock pin to the adapter to the end firmly.
●Supply pressure slowly, and ensure no air leaks.
●The Pressure switch can be assembled with rotated 180 degree.
Modular AR/AW series
ARM10/11 series
-25-
0.6±0.05 Nm
0.32±0.03 Nm
No.PS※※-OMJ0004-E