How to reset the product after a power cut or forcible de-energizing
The setting of the product will be retained as it was before a power cut or de-energizing. The output condition
is also basically recovered to that before a power cut or de-energizing, but may change depending on the
operating environment. Therefore, check the safety of the whole installation before operating the product. If
the installation is using accurate control, wait until the product has warmed up (approximately 20 to 30
minutes).