Electrostatic Discharge Protection; Overview Of The Installation Procedure - Keysight Technologies E8364-60108 Installation Note

Microwave network analyzers
Table of Contents

Advertisement

General Information
Installation Procedure for the Upgrade Kit

Electrostatic Discharge Protection

Protection against electrostatic discharge (ESD) is essential while removing or
connecting cables or assemblies within the network analyzer.
Static electricity can build up on your body and can easily damage sensitive
internal circuit elements when discharged. Static discharges too small to be
felt can cause permanent damage. To prevent damage to the instrument:
— al ways wear a grounded wrist strap having a 1 MΩ resistor in series with it
— al ways use a grounded, conductive table mat while working on the
— al ways wear a heel strap when working in an area with a conductive floor. If
— al ways ground yourself before you clean, inspect, or make a connection to
Figure 1
strap. Refer to
for part numbers.
Figure 1
ESD Protection Setup

Overview of the Installation Procedure

Step 1. Remove the Outer Cover.
Step 2. Remove the Front Panel Assembly (Option 014 Only).
Keysight E8363B/C and E8364B/C Installation Note
when handling components and assemblies.
instrument.
you are uncertain about the conductivity of your floor, wear a heel strap.
a static-sensitive device or test port. You can, for example, grasp the
grounded outer shell of the test port or cable connector briefly.
shows a typical ESD protection setup using a grounded mat and wrist
"Tools and Equipment Required for the Installation" on page 6
5

Advertisement

Table of Contents
loading

Table of Contents