Installation Procedure For The Upgrade Kit - Keysight Technologies E8364-60108 Installation Note

Microwave network analyzers
Table of Contents

Advertisement

General Information

Installation Procedure for the Upgrade Kit

Table 1
Contents of Option UNL Upgrade Kit (E8364-60108)
Ref.
Desig.
These parts are for analyzers WITH Option 014 AND Option 081
Lower front panel overlay (Option UNL/014)
W67
RF cable, A25 test port 1 coupler to PORT 1 CPLR ARM
W68
RF cable, A26 test port 2 coupler to PORT 2 CPLR ARM
W71
RF cable, RCVR R2 IN to A29 channel R2 mixer
W81
RF cable, A36 step attenuator to PORT 1 SOURCE OUT
W82
RF cable, A37 step attenuator to PORT 2 SOURCE OUT
W83
RF cable, PORT 1 CPLR THRU to A38 bias tee
W84
RF cable, PORT 2 CPLR THRU to A39 bias tee
W99
RF cable, A45 reference switch to A28 channel R1 mixer
Installation Procedure for the Upgrade Kit
The network analyzer must be in proper working condition prior to installing
this option. Any necessary repairs must be made before proceeding with this
installation.
This installation requires the removal of the analyzer's protective
outer covers. The analyzer must be powered down and
disconnected from the mains supply before performing this
procedure.
4
Description
Keysight E8363B/C and E8364B/C Installation Note
Qty
Part Number
1
E8364-80011
1
E8364-20043
1
E8364-20044
1
E8364-20155
1
E8364-20053
1
E8364-20054
1
E8364-20039
1
E8364-20040
1
E8364-20154

Advertisement

Table of Contents
loading

Table of Contents