Reference 5: Installation Steps And Task Allocation - Patlite WD-Z2 Series Installation Manuallines

Wireless data acquisition system
Table of Contents

Advertisement

WD-Z2 Series Installation Guidelines Rev.5
10.

Reference 5: Installation Steps and Task Allocation

AirGRID WD-Z2 series installation and task assignment table
Step
1.
Decide on target facility
Determine how to use
2.
facility operation log
Radio Environmental
3.
Survey
Target equipment
4.
Signal Tower survey
5.
Device Settings List
6.
WD Default Settings
7.
Installation
System Operation
8.
Check
Task Description / Check Item
Target facility should consider collecting equipment operation data.
Use WD partner packages, or develop within the company
Wireless 2.4 GHz band radio environment survey
(Radiation noise from manufacturing equipment, wireless LAN,
etc.)
Determine optimum receiver installation location
Check radio waves received from target equipment
Indicator Light for each equipment
Determine WDT configuration and select grouping of model and
equipment
Transmitter/Receiver wireless Ch, Pan ID, other settings
Various Transmitter Settings
Receiver IP address
Receiver Installation
- LAN Cable, transmitter power supply installation
- WD compatible equipment: additional wiring for WDT power
supply signal line
- WD non-conforming equipment: signal light replacement, wiring
Create definition file
Check WDS-AUTO2 log data
- 40 -
Primary Contact

Advertisement

Table of Contents
loading

Table of Contents