WD-Z2 Series Installation Guidelines Rev.5
5.

Maintenance

(1) New Equipment Installation

Specify the equipment manufacturer to install in the WD. After equipment delivery, remove the transmitter
to re-configure the various settings by using the Startup Kit.
(See Step 6) If the LME or LE Series WD compatible signal towers is specified, request the color and
wiring for the transmitter power supply. By doing so, the work required after equipment delivery can be
reduced. Also, tasks following equipment delivery can be omitted.
The following instructions are included with the LME / LE series WDT-6M-Z2 / WDT-5E-Z2 transmitter.
The following instructions are included with the LR series WDT-6LR-Z2 / WDT-5LR-Z2 transmitter.