ICP DAS USA ISaGRAF mPAC Series Getting Started page 40

Table of Contents

Advertisement

3. Now, you can set the Address, Baud rate and Checksum. After configuration, you
must click "Setting" to save the settings.
4. You have completed the setting; please adjust the DIP Switch to "OFF" position and
restart the power. Finally, you can serch the module again to comfirm settings.
Follow the steps to
comfirm the settings.
Note:
Remember to remove the wire between INIT* and GND, then restart the power if you
use the I-7000 I/O module.
Getting Started: PAC-5007(P)/5107(P)/5207/5307 Ver. 1.0, 07/2010
3-20
3.
ICP DAS

Advertisement

Table of Contents
loading

Table of Contents