UPS5000-E-(60 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
Figure 3-4 Installing the sliding plates
Step 5 Raise the four anchor bolts to the highest position using an adjustable wrench.
Figure 3-5 Raising the leveling feet
Step 6 Move the UPS over its castors near the installation position.
Issue 01 (2020-04-13)
Copyright © Huawei Technologies Co., Ltd.
3 Installation
59