Chapter 4 Procedures Before Operation - Mitsubishi Electric MELSEC iQ-R Series User Manual

High speed digital-analog converter module
Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting a module
Mount the D/A converter module in any desired configuration.
2.
Wiring
Perform wiring of external devices to the D/A converter module.
Page 27 External Wiring
3.
Adding a module
Add the D/A converter module to a module configuration by using the engineering tool. For details, refer to the following.
 GX Works3 Operating Manual
4.
Parameter setting
Set the parameters of the D/A converter module by using the engineering tool. For details, refer to the following.
 MELSEC iQ-R High Speed Digital-Analog Converter Module User's Manual (Application)
5.
Offset/gain setting
Perform the offset/gain setting to use a user range setting, if necessary.
6.
Programming
Create a program. For details, refer to the following.
Page 29 OPERATION EXAMPLES
4 PROCEDURES BEFORE OPERATION
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-r60dah4-u-in-e

Table of Contents