Installation Of The Snmp Board; Elevation Kit - ABB DPA 250 S4 Operating Manual

50-250 kw 380/400/415 v iec
Table of Contents

Advertisement

110
D PA 2 5 0 S 4 5 0 - 2 5 0 K W O P E R AT I N G M A N U A L
15.1.4
15.1.4-1: SNMP board
installation (1)
1. Remove the 4 plastic lids from the unit
15.1.4-2: SNMP board
installation (2)
15.1.4-1
15.2

Elevation kit

15.2-1: Elevation kit
15.2-1

Installation of the SNMP board

THE OPERATIONS DESCRIBED IN THIS
CHAPTER MUST BE PERFORMED BY A
SERVICE ENGINEER OF THE
MANUFACTURER OR BY AN AGENT
CERTIFIED BY THE MANUFACTURER
2. Insert the SNMP card inside the slot
15.1.4-2
THIS KIT MUST BE INSTALLED ONLY ONCE
THE UNIT IS ALREADY PLACED IN ITS
FINAL POSITION.
NOTE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents