The Handy THSS100 Instruction Manual page 10

100lb (45.5kgs) salt spreader
Table of Contents

Advertisement

STEP 7
Insert R-pin (17) into the hole of the gearbox spindle, which protrudes though the bottom of the
hopper.
Attach the ends of the connecting rod (25) to the pivot bracket assembly (19) and gauge lever
assembly (4). Remove the nuts at both ends and insert the connecting rod into the gauge and
bracket assemblies. Retighten the nuts at both ends.
Insert the connecting rod B (46) and secure using two flat washers (43) and one M6 lock nut (24).
Tighten all hardware in steps 4, 5 and 6.

Advertisement

Table of Contents
loading

This manual is also suitable for:

193878002

Table of Contents