Disassembly - EMG ELDRO Ed 12/4 Assembly Manual

Electro-hydraulic lifting thrusters, standard range and special designs (three-phase voltage version)
Table of Contents

Advertisement

10

Disassembly

9.2
Maintenance schedule
10
Disassembly
76 / 83
The following safety regulations must be adhered to before beginning
any work on ELDRO
 Ensure that the industrial system is shut down.
 De-energise the system.
 Safeguard the system to prevent it being switched on again.
 Test to ensure a de-energised state.
 Cover or isolate adjacent live parts.
WARNING
Opening the ELDRO
Risk of injury due to tensioned c springs.
– Only service partners authorised by the manufacturer are
permitted to dismantle the ELDRO
manufacturer's factory.
CAUTION
Switch-off due to any c springs, brake springs, brake weights
that may be installed or due to other external influences
Risk of crushing due to the lifting rod.
– Before removing the ELDRO
drive must be secured, as the lifting rod retracts
automatically.
®
thrusters:
®
thrusters
®
thrusters, the downstream
ELDRO-Assembly-manual-344029-EN.docx
®
thrusters outside the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents