Maintenance Schedule - EMG ELDRO Ed 12/4 Assembly Manual

Electro-hydraulic lifting thrusters, standard range and special designs (three-phase voltage version)
Table of Contents

Advertisement

9
Maintenance
9.2

Maintenance schedule

9.2
Maintenance schedule
Table 63:
Maintenance log for ELDROclassic
®
ELDROclassic
type
Serial number
System ID
Classification
according to section
3.1 (table 1)
Test object
Cleaning
Test run
Visual checks
Leaks
Bolt connections
Terminal box cover
Cable connections tight
External damage
Functional inspection
Motor functions, running
noises
max. lifting path
Terminal box and cable
infeed leak tightness
Position indicator, signals,
adjustment
Extended test
Actuating force
measurement
Reset force measurement
Power consumption
measurement
Insulation resistance
measurement
Coil resistance
measurement
74 / 83
®
Low
Standard
requirements
Test interval according to classification
as required
as required
Every six months
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
Annually
lifting thrusters
Higher
requirements
as required
Every six months
Every six months
Every six months
Every six months
Every six months
Annually
Annually
Annually
Annually
Every 2-3 years
Every 2-3 years
Every 2-3 years
Every 2-3 years
Every 2-3 years
ELDRO-Assembly-manual-344029-EN.docx
Test
Test
performed
passed
measured values
Evaluation /

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents