Checking The Operating Conditions Prior To Starting Up - EMG ELDRO Ed 12/4 Assembly Manual

Electro-hydraulic lifting thrusters, standard range and special designs (three-phase voltage version)
Table of Contents

Advertisement

7
Notes on operation
7.1

Checking the operating conditions prior to starting up

7.1
Checking the operating conditions prior to starting up
66 / 83
Never operate the ELDRO
are faulty or not ready for operation.
The junction box must always be locked. Access must only be
granted to authorised staff who have received corresponding training
and safety briefings.
If there are power supply faults, switch the ELDRO
immediately.
NOTE
When delivered from the factory, the junction box has a small bag
(silica gel) in order to catch any moisture that may occur.
This small bag (silica gel) must be removed prior to commissioning.
 The ELDRO
®
thruster is assembled and connected according to
regulations (⇒Assembly and installation section).
 The permissible voltage and frequency tolerances are adhered to
(⇒Technical data chapter, Voltage and frequency tolerances
section).
 The ELDRO
®
thruster is filled with the operating fluid prescribed for
the usage conditions (⇒ Technical data chapter, Ambient
temperature and installation height section) and for the version,
and has the required fill level (⇒Maintenance chapter, Operating
fluid section).
 The ELDRO
®
thruster is protected against contamination.
 The fastening bolts on the thrust shackle and the foot attachment
must be secured to prevent them moving inadvertently (e.g. using
locking pins).
 The axes are parallel.
®
thruster with electrical connections that
ELDRO-Assembly-manual-344029-EN.docx
®
thruster off