Unpacking And Checking - Huawei UPS5000-E Series User Manual

25 kva power modules
Hide thumbs Also See for UPS5000-E Series:
Table of Contents

Advertisement

UPS5000-E-(25 kVA-125 kVA)
User Manual (25 kVA power modules)

3.1.4 Unpacking and Checking

Context
Issue 06 (2020-01-10)
Model
UPS
Capacity
50 kVA
75 kVA
100 kVA
125 kVA
The input upstream circuit breakers recommended in
If multiple loads are connected, specifications for branch circuit breakers must not exceed the
recommended specifications.
The circuit breaker selection principle is to protect loads and cables, and the cascading principle is to
realize specific protection.
Only trained personnel are allowed to move the UPS. Use a pallet truck to transport the
UPS box secured to a wooden support to the installation position.
To prevent the UPS from falling over, secure it to a pallet truck using ropes before moving
it.
To prevent shocks or falls, move the UPS gently. After placing the UPS in the installation
position, unpack it and take care to prevent scratches. Keep the UPS steady during
unpacking.
Copyright © Huawei Technologies Co., Ltd.
Component
Mains input
breaker
Bypass input
breaker
Mains input
breaker
Bypass input
breaker
Mains input
breaker
Bypass input
breaker
Mains input
breaker
Bypass input
breaker
Table 3-6
Specifications
Manufacturer
located is less
than 6 kVA)
T1N160 TMD
ABB
R100 FFC 3P
(recommended
when the short-
T1N160 TMD
circuit current
R100 FFC 3P
where the
switch is
T1N160 TMD
located is less
R160 FFC 3P
than 36 kVA)
T1N160 TMD
R160 FFC 3P
T3N250 TMD
R200 FF 3P
T3N250 TMD
R200 FF 3P
T3N250 TMD
R250 FF 3P
T3N250 TMD
R250 FF 3P
are for reference only.
3 Installation
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-e-125k-f125

Table of Contents