Huawei UPS5000-E Series User Manual page 52

25 kva power modules
Hide thumbs Also See for UPS5000-E Series:
Table of Contents

Advertisement

UPS5000-E-(25 kVA-125 kVA)
User Manual (25 kVA power modules)
Table 3-4
Table 3-4 Power cable connector requirements for the UPS5000-E-125 kVA
Connector
Mains input
connector
Bypass input
connector
Battery input
connector
Output connector
Grounding
connector
Table Input front-end switch configurations
configurations for the UPS5000-E.
Table 3-5 Input front-end switch configurations
Input Front-end
Switch
Mains input front-
end switch
Bypass input front-
end switch
Table 3-6 Input front-end switches
Model
UPS5000-E-
125K-F125
Issue 06 (2020-01-10)
The AC voltage loss is less than 3%, and the DC voltage loss is less than 1%.
Single- or multi-core 90° C soft power cable with a copper conductor.
The AC power cable for the UPS5000-E-(75 kVA–125 kVA) are no longer than 30 m, and the DC
power cable is no longer than 40 m. Neither the AC nor DC power cables for the UPS5000-E-(25
kVA–50 kVA) are longer than 20 m.
lists the power cable connector requirements.
Connection
Mode
Crimped OT
terminals
Crimped OT
terminals
Crimped OT
terminals
Crimped OT
terminals
Crimped OT
terminals
UPS5000-E-125K-F125
25 kVA
63 A/3P
63 A/3P
UPS
Capacity
25 kVA
Copyright © Huawei Technologies Co., Ltd.
Bolt Type
M10
M10
M12
M10
M10
lists the recommended input front-end switch
50 kVA
75 kVA
100 A/3P
160 A/3P
100 A/3P
160 A/3P
Component
Mains input
breaker
Bypass input
breaker
Bolt Hole
Torque
Diameter
10.5 mm
26 N m
10.5 mm
26 N m
13 mm
46 N m
10.5 mm
26 N m
10.5 mm
26 N m
100 kVA
200 A/3P
200 A/3P
Specifications
Manufacturer
T1N160 TMD
ABB
R63 FFC 3P
(recommended
when the short-
T1N160 TMD
circuit current
R63 FFC 3P
where the
switch is
3 Installation
125 kVA
250 A/3P
250 A/3P
44

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-e-125k-f125

Table of Contents