UPS5000-E-(25 kVA-125 kVA)
User Manual (25 kVA power modules)
Figure 3-29 Removing the copper bars
Store the removed copper bars.
Step 2 (Optional) Connect cables to the input PDC.
For details, see the PDC-0630ACV4INA Power Distribution Unit User Manual.
Step 3 Connect the mains input power cables to the mains input terminals 1L1, 1L2, 1L3, and N.
Connect the bypass input power cables to the bypass input terminals 2L1, 2L2, 2L3, and N, as
shown in
Issue 06 (2020-01-10)
Figure
3-30.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
68