Documentation
Documentation
-
-
-
-
-
The "Safety inspection" test record is available from the Fronius Download Center.
Test label
After a positive inspection, the respective test label according to PMÜ-01 is to be affixed to
the housing in a visible position.
The electrician who performed the tests is responsible for compiling the proper docu-
mentation.
Document all completed tests in a test record. Enter both the measured values and
the equipment/calibration data used.
If an individual test cannot be performed, the resulting decision must be justified and
documented by the examiner
Any device that fails a test must be clearly marked as unsafe and the operator in-
formed. The device may no longer be used.
Once a device passes the test, an inspection sticker (42,200,101) must be affixed to it.
109