Otto Bock 5R9 Instructions For Use Manual page 16

Hide thumbs Also See for 5R9:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 11
Connecting the pyramid adapter and pyramid receiver
The pyramid adapter is fixed with the set screws of the pyramid receiver.
Materials required: 710D4 torque wrench, 636K13 Loctite®
>
1) Trial fitting: Insert the pyramid adapter into the pyramid receiver and
tighten the set screws (7 Nm).
2) Definitive mounting: Insert the pyramid adapter into the pyramid
receiver, secure the set screws with Loctite® and tighten them (7 Nm).
3) Replace any set screws that are protruding or are recessed too much
with suitable set screws (see selection chart).
6 mm
5006G3=M6X6
Alignment
The set screws in the pyramid receiver can be used to make static adjust­
ments during alignment, trial fittings and after the prosthesis is finished.
Replacement and disassembly
The set position of the prosthetic component can be maintained during
replacement or disassembly. In order to do this, unscrew the two set screws
that are screwed in the furthest and located next to each other.
6 Cleaning
1) Clean the product with a damp, soft cloth.
2) Dry the product with a soft cloth.
3) Allow to air dry in order to remove residual moisture.
7 Maintenance
CAUTION
Failure to follow the maintenance instructions
Risk of injuries due to changes in or loss of functionality and damage to the
product
► Observe the following maintenance instructions.
► The prosthetic components should be inspected after the first 30 days of
use.
► Have the prosthetic components inspected every 3 months.
► Inspect the entire prosthesis for wear during normal consultations.
16
Selection chart for set screws
12 mm
5006G3=M6X12
16 mm
5006G3=M6X16

Advertisement

Table of Contents
loading

This manual is also suitable for:

4r60

Table of Contents