Pna-L Rf Interface Cable Connections - Keysight Technologies U3042AM04 User's And Service Manual

Table of Contents

Advertisement

U3042AM04
System Setup with N5230A/C and N5232A/B

PNA-L RF Interface Cable Connections

Figure 11 on page 16
and indicates the final two digits of the part number for each cable. The cables are
supplied in the interface cable kit (U3021-60045).
1. Remove the SOURCE OUT to CPLR THRU and RCVR IN to CPLR ARM jumpers
2. Connect the RF interconnect cables, supplied with this option, from the PNA-L to
Each end of the interconnect RF cables have a different length from the bend. When
connecting the RF Interconnect cables be sure that the longer end (from the bend) is
connected to the PNA-L.
Over torque will cause damage to the Test Set and may cause connectors to spin or
become loose.
Table 8
PNA-L Interface Cable Connection (U3021-60045)
RF Cables
Z5623-20418 (short)
Z5623-20418 (short)
Z5623-20419 (long)
Z5623-20419 (long)
15
illustrates the cable configuration of the Test Set to the PNA-L,
(x16) on the PNA. The RCVR R1 to SOURCE OUT reference loop jumper (x1)
remain on the front panel.
the Test Set. Torque each cable to 8 in-lb. The Z5623-20418 are the short cables
and the Z5623-20419 are the long cables. Refer to
From PNA-L
To Test Set
SOURCE OUT
SOURCE OUT
CPLR ARM
CPLR ARM
CPLR THRU
CPLR THRU
RCVR IN
RCVR OUT
Keysight U3042AM04 User's and Service Guide
Table 8
and
Figure
11.

Advertisement

Table of Contents
loading

Table of Contents