Installation - Festo CPA-SC Series Manual

Table of Contents

Advertisement

3. Installation

Contents of this chapter
Further information
Festo P.BE−CPASC−EN en 0808c
This chapter deals with the tubing and wiring of the CPA−SC
valve terminal. The following in particular belong here:
General instructions on preparing the compressed air and
on connecting the tubing
Instructions on pilot control of the valve coils with internal
or external pilot air
Instructions on operating the valve terminals with
pressure zone separation
Instructions on vacuum/low pressure operation
Fitting the QS screw connectors
Connecting the power supply
Earthing the valve terminal
Address assignment of the valves
Instructions on connecting the electric multipin can be found
in the leaflet supplied with the product.
3−3

Advertisement

Table of Contents
loading

Table of Contents