Electric Power Plug - Baxi CBP Matic 18 Manual

Pellet boiler
Table of Contents

Advertisement

Available languages

Available languages

Check to see whether the pellet reservoir is supplied with pellets. Inside thepellet
reservoir is a safety grid to prevent users from reaching theworm screw.
Always check whether the burner is unblocked before igniting the boiler.
The boiler's combustion chamber, as well as its doors, are made of iron
plate painted with high temperature resistant paint. Fumes are released during
the initial burning sessions due to the curing of this paint.
Avoid touching the unit during its first burn to prevent leaving permanent
marks on the paint. The paint goes through a more plastic phase during the
curing process. The curing of the paint occurs at approximately 300ºC and for
30 minutes.
Ensure that the hydraulic circuit was correctly assembled and is connected to the
water supply;
You should check that there is sufficient ventilation in the room where the unit is
installed, otherwise it will not work properly. You should therefore check to see
whether there are other heating air-consuming units in the room (e.g. gas units, oil
boilers, etc.), which should not be used simultaneously with the unit.
The pellet-run boiler is equipped with a sensor probe for measuring room
temperature. This probe is attached to the grid located on the back panel of the unit
(Figure 9). For a good reading of the room temperature, avoid the contact between
the end of the probe and the unit chassis. You may also attach the probe to the wall
beside the unit.
Figure 8 – Electric power plug.
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbp matic 24Cbp matic 30

Table of Contents