Assembly Of The Ramp To Drop The Pellets In The Boiler’s Tank; Worm Drive Channel For Storage Unit Installation On The Right Side - Baxi CBP Matic 18 Manual

Pellet boiler
Table of Contents

Advertisement

Available languages

Available languages

c)
d)
Figure 31 – Assembly of the ramp to drop the pellets in the boiler's tank
4 – Before proceeding with the assembly of the storage unit, you should check if the
worm drive channel is properly docked in its base. To do this, open the lid of the
storage unit and check if the docking is in accordance with Figura 32-a. Also, check if
the pellet's output tube is in line with the opening of the storage unit (Figura 32-b).
a)
b)
Figure 32 – Worm drive channel for storage unit installation on the right side
5 – Place the flexible hose on the storage unit's pellet output tube and attach it using
the metal bracket provided. The flexible hose must make a downward curve (Figura
33-c).
50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbp matic 24Cbp matic 30

Table of Contents