Removing The Upper Lids - Baxi CBP Matic 18 Manual

Pellet boiler
Table of Contents

Advertisement

Available languages

Available languages

8 – After removing the lids you should secure the storage unit to the boiler
assembling, at the back, the provided part, and secure it with the screws, as shown in
the following figures.
Figure 36 – Attaching and securing the storage unit to the boiler – Rear view
9 – The adjoining sides of the storage unit and the boiler should be secured in place
using the screw and the mounting bracket provided.
c)
Figure 35 – Removing the upper lids
a)
d)
b)
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbp matic 24Cbp matic 30

Table of Contents