Installation Requirements - Baxi CBP Matic 18 Manual

Pellet boiler
Table of Contents

Advertisement

Available languages

Available languages

3.1

Installation requirements

The minimum distance required between the pellet-run boiler and any highly
flammable surfaces is found specified in 4.
The top of the boiler must be at a distance of at least 100 cms from the ceiling,
especially in rooms with ceilings composed of flammable materials.
The base supporting the boiler cannot be of flammable material. As such, adequate
protection should always be used.
a)
b)
Figure 4 – Minimum distances from all surfaces: a) upper view of the unit's
installation; b) side view of the unit's installation
Warning!
Keep combustible and flammable materials at a safe distance.
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbp matic 24Cbp matic 30

Table of Contents