Prolon Installation and Start Up Guide

PROLON INSTALLATION AND START UP GUIDE
System layout and cabling
Part 1 - Project Preparation & Cabling
1. Using a floor plan, determine the system's zone controller
locations as well as the unit controller's (control panel)
location. Mark them on your plans for later access.
2. The unit and zone controllers must be addressed. Their
relative location on the network bus is not important.
3. As a result, determine the shortest path for the network
cables as well as the supply cables which connect the
controllers together. The communication loop must
be an open daisy chain and must not exceed 3200ft
(1000m).
4. Once the network path has been determined, identify
the two controllers that will be at each extremity of
the network. Mark them on your plans.
Wiring the zones in a network
REV 7.0.0 / PL-TRA-STARTUP-EN
Communication
1
room sensors
2
Supply/Outputs
3
4
Unit sensors
5
System Layout and Cabling
Part 1: Project preparation & cabling
4 wire cable (#22/4 shielded cable
recommended)
#18/2 or #18/3 wire, LVT standard
#24/2 wire, twisted and shielded, low capacitance
Network
("LOW-CAP") grounded at control cabinet,
max length 3200ft (1000m)
PROLON INSTALLATION AND
#18/2 or # 18/3 wire, twisted and shielded
grounded at control cabinet
Wire to unit
#18/8 (or #18/10) wire, LVT standard
T1000 Sensor
T200 Sensor
System layout and cabling
1- Using a oor plan, determine the system's zone
Part 1: Project preparatio
controller locations as well as the unit controller's
(control panel) location
- Mark them on your plans for later access.
2- The master controller must be addressed but the
zone controllers are addressed via the software.
Their location and address in the network are not
important.
3- As a result, determine the shortest path for the
network cables as well as the supply cables which
connect the controllers together. The
communication loop must be an open daisy
chain.
4- Once the network path has been determined,
Identify the two controllers that will be at each
extremity of the network. Mark them on your
plans.
Wiring the Zones in a Network
Wiring the zones in a network
T1000 Sensor
1- Using
controlle
(control
- Mark th
2- The m
zone co
Their loc
importan
3- As a
network
connect
commu
chain.
4- Once
Identify
extremi
plans.
3
3

Advertisement

Table of Contents
loading

Table of Contents