UPS5000-H-1200 kVA
User Manual (100 kVA Power Modules)
Figure 3-17 Installing battery cables
(1) Connect the ground cable of the battery string or its BBB box to the battery PE of the
UPS or the ground bar in the equipment room based on the site survey.
Step 4 Install top supports and covers of the battery terminal protective covers.
Figure 3-18 Installing top supports and covers
Step 5 Connect input and output busbars based on the top copper bar position diagram.
Issue 01 (2020-07-15)
The number and colors of cables are for reference only.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
66