SUN2000-(33KTL, 40KTL)-JP
User Manual
----End
Follow-up Procedure
Check that the cables are connected correctly and securely. Then seal the connectors.
6.6 Closing the Maintenance Compartment Door
Procedure
Step 1 Install the AC terminal cover.
Issue 07 (2019-06-30)
d.
Route the cables through the locking caps and then the COM1 port at the SUN2000
bottom.
e.
Insert the RJ45 connector into the RJ45 network port in the SUN2000 maintenance
compartment.
Figure 6-29 Connecting communications cables
f.
Bundle communications cables after connecting them.
g.
Use a torque wrench with an open end of 33 mm to tighten the locking cap to a
torque of 7.5 N•m.
Copyright © Huawei Technologies Co., Ltd.
6 Electrical Connections (12-pin Spot-Check Terminal)
89