Maintenance; Routine Maintenance - Huawei SUN2000-33KTL-JP User Manual

Hide thumbs Also See for SUN2000-33KTL-JP:
Table of Contents

Advertisement

SUN2000-(33KTL, 40KTL)-JP
User Manual

9.1 Routine Maintenance

To ensure that the SUN2000 can operate properly for a long term, you are advised to perform
routine maintenance on it as described in this chapter.
Table 9-1 Maintenance list
Item
System
cleanliness
System
running
status
Cable
connections
Issue 07 (2019-06-30)
Before cleaning the system, and maintaining the cable connections and grounding
reliability, power off the system (see
two DC switches on the SUN2000 are OFF.
If you need to open the maintenance compartment door in rainy or snowy days, take
protective measures to prevent rain and snow entering the maintenance compartment. If it
is impossible to take protective measures, do not open the maintenance compartment door
in rainy or snowy days.
Check Method
Check periodically that the heat sinks are free
from obstacles or dust.
Check that the inverter is not damaged or
deformed.
Check that the running sound of the inverter
is normal.
When the inverter is running, check that all
inverter parameters are correctly set.
Check that cables are securely connected.
Check that cables are intact, in particular, the
parts touching the metallic surface are not
scratched.
Check that the idle COM, USB, and AC
OUTPUT ports are locked by waterproof
Copyright © Huawei Technologies Co., Ltd.
9
7.3 Powering Off the
SUN2000) and ensure that the

9 Maintenance

Maintenance
Maintenance
Interval
Once six months to a
year
Once six months
The first inspection is
half a year after the
initial commissioning.
From then on, perform
the inspection once six
months to a year.
105

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-40ktl-jp

Table of Contents