Oc-3/Stm-1/Oc-12/Stm-4 Optical Transmission Test - Alcatel-Lucent 1850 Installation And System Turn-Up Manual

Transport service switch (tss-5) | release 5.1
Hide thumbs Also See for 1850:
Table of Contents

Advertisement

Connecting adjacent network elements
............................................................................................................................................................................................................................................................

OC-3/STM-1/OC-12/STM-4 optical transmission test

Procedure
This procedure should be conducted when the Alcatel-Lucent 1850 TSS-5 shelf is set to
UPSR/SNCP or any other application and connected end to end and not looped back on
itself.
........................................................................................................................................................................................................................
1
At the NE system level view. Initialize all performance monitoring registers by entering
the Performance -> Initialize- > PM Registers command and select Both.
........................................................................................................................................................................................................................
2
Wait 15 minutes.
........................................................................................................................................................................................................................
3
At the test location, enter the following command at the NE system level:
View Performance -> View PMreport and select OCnLine, Select Time Period of
1-Day Current Date, 0-up.
Highlight all on the left-hand side and Apply.
Requirement:
values should be "0".
........................................................................................................................................................................................................................
4
Repeat
location.
........................................................................................................................................................................................................................
5
Repeat
........................................................................................................................................................................................................................
6
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
............................................................................................................................................................................................................................................................
365-372-403R5.1
Issue 1 November 2008
The Response Window indicates no transmission errors, all monitor
Step 1
thorough
Step 3
Step 1
three
Step 3
for each node in the ring.
S
F
T E P S
OC-3/STM-1/OC-12/STM-4 optical transmission test
for all Alcatel-Lucent 1850 TSS-5 shelves at the test
Table III-1, "Part III installation checklist" (p.
III-1).
7 - 7

Advertisement

Table of Contents
loading

Table of Contents