Steps for Finalizing the Installation

1. Remove the glass (see page 25).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be
detected once it enters the firebox, ensuring gas does not build up.
3. Make sure the accent light bulbs are in place and work correctly.
NOTE: Take care to not touch the bulb with your fingers – use a cloth or paper towel).
4. Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case
the household (AC) power goes out and are required for operation.
the remote (see illustration below). Synchronize the transmitter to the IFC (see page 31).
5. Install the burner and media (and firebacks if applicable).
6. Replace the glass.
7. Start the heater.
8. Leak test all gas joints.
© Travis Industries
Finalizing the Installation
Firebox Ceiling Accent Light
9/17/2020 - 1536
Install three AAA batteries into
DVL EG GSR2
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dvl eg gsr2 insertDvs emberglo gsr2

Table of Contents