4.2 Installation Environment

Install the Battery Cabinet indoors. Do not place it outdoors.
Make sure that transportation routes (e.g. corridors, door gates, elevators, etc.) and
installation area can accommodate and bear the weight of the Battery Cabinet, UPS
and handling equipment. Please refer to Table 1 for floor weight loading information.
Table 1: battery cabinet weight loading table
Battery
9Ah
Cabinet
Capacity
Battery
4
Module
Q'ty
672.4 lb
Weight
(305 kg)
122.5
Weight
lb/ft²
Loading
(598
kg/m²)
Ensure that the installation area is big enough for maintenance and ventilation. Since
the Battery Cabinet adopts the design of air inlet at the front and air outlet at the rear,
we suggest that you keep a distance of 17.72" (45 cm) from the top of the Battery
Cabinet for wiring, maintenance and ventilation.
Keep the installation area clean. Please note that wiring routes must be hermetic to
prevent possible damage from rodents
Keep the installation area's temperature around 77°F (25°C) and humidity below
95%. The highest operating altitude is 3300 ft (1000 m) above sea level.
18Ah
27Ah
8
12
879.6 lb
1086.9 lb
(399 kg)
(493 kg)
160.2
198.0
lb/ft²
lb/ft²
(782.4
(966.7
kg/m²)
kg/m²)
DPH-LV-B
36Ah
45Ah
16
20
1294.1 lb
1501.3 lb
(587 kg)
(681 kg)
235.7
273.5
lb/ft²
lb/ft²
(1151
(1335.3
kg/m²)
kg/m²)
10
54Ah
63Ah
24
28
1708.6 lb
1915.8 lb
(775 kg)
(869 kg)
311.2
349.0
lb/ft²
lb/ft²
(1519.6
(1703.9
kg/m²)
kg/m²)
72Ah
32
2123.1 lb
(963 kg)
386.7
lb/ft²
(1888.2
kg/m²)