4.4 Fixing the Battery Cabinet

Please follow the steps below:
(1) Before fixing the Battery Cabinet in a designated installation area, please double-
check whether the area's floor weight loading is sufficient to bear the Battery Cabinet,
UPS and handling equipment (i.e. forklift) to avoid accidents. For Battery Cabinet
floor weight loading information, please refer to Table 1.
(2) After the Battery Cabinet is moved to the designated installation area, use an 11/16"
(17 mm) socket wrench to stabilize the Battery Cabinet's four leveling feet on the
floor. Please note that the Battery Cabinet must stand on the floor stably and levelly
without any tipping.
(3) Use an 11/16" (17 mm) socket wrench and three M10 screws (originally used to fix
the front balance support on the pallet) to install the front balance support (removed
during the unpacking process) at the front of the Battery Cabinet. Use the three
expansion screws and nuts (provided by service personnel) to fix the front balance
support on the ground to avoid Battery Cabinet movement. Please see Figure 7.
Figure 7: balance support installation_ front of the battery cabinet