Delta Modulon Series User Manual page 27

Three phase 15-105 kva 208vac external battery cabinet
Table of Contents

Advertisement

Figure 21: function contact of battery cabinet
WARNING:
1. When the UPS sends the "shunt trip signal" to trip the breaker, it
requires 24Vdc/ 120W power to trip the breaker. If the power is below
120W or under 24Vdc, the tripping device may not work. The power
must be supplied from an isolated power source.
2. For installation of the power supply device, please contact Delta
customer service. Only authorized Delta engineers or service
personnel can perform the installation.
NOTE:
1. Suitable cable size of the function contact is 22 ~ 18 AWG.
2. Strip length of the cables should be 0.35" ~ 0.39" (9 ~ 10 mm).
3. The maximum length (recommended) of the cables connected to the
UPS is 33 ft (10 m).
4. The maximum length (recommended) of the cables connected to the
24Vdc power supply is 6.6 ft (2 m).
26
-
+

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dph seriesDph-lv-bDph-60k-lvDph-105k-lv

Table of Contents