PREPARING MACHINE FOR PLATFORM OPERATION

The following must be completed from the cab to transfer power to the platform.
1. Verify platform is properly installed and quick attach lock pin is fully engaged. See
"Platform Installation" on page 5-3. Platform (1) will be shown on display.
2. Apply park brake.
3. Shift transmission control lever to neutral.
4. Fully retract boom and lower boom below 10 degrees.
5. Fully lower outriggers, lifting front tires and ensure machine is level. Display indicates
when outrigger (2) and level (3) requirements are satisfied.
6. Shut off engine and rotate key to Platform position. Display indicates machine is in
platform mode (4).
7. Remove key and verify the power/emergency stop switch is pulled up.
8. Exit cab.
31200345

SECTION 4 - OPERATION

1
N1
3
N1
4
N1
Section 4 - Operation
0000
RPM
0000
00
OZ3041
0000
RPM
0000
2
00
OZ3051
0000
RPM
0000
00
OZ3061
4-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4013ps4014ps4017ps

Table of Contents