JLG 3513PS Operation & Safety Manual page 22

Platforms
Table of Contents

Advertisement

Section 2 - Pre-Operation and Inspection
6. Operational Check - Once the walk-around inspection is complete, perform an
operational check (see page 2-9) of all systems in an area free of overhead and
ground level obstructions. See Section 3 - Controls and Indicators for more specific
operating instructions.
If telehandler does not operate properly, immediately bring machine to a stop, lower
boom and attachment to ground and stop the engine. Determine cause and correct
before continued use.
2-2
WARNING
31200345

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4013ps4014ps4017ps

Table of Contents