10. Please consider that the procedure described in the steps above is the same if the steam/ hot water
boiler is deactivated: also in this case the steam/ hot water boiler will be filled and the PID display
indicates the temperature in the steam/ hot water boiler.
11. The machine is now ready for use.
Before preparing the first coffee, please clean the machine by extracting about 2L of hot
water from the brew group and the hot water wand.
5.2 Machine in use with direct water connection (steam/ hot water boiler activated)
1. Please make sure that the valve at the bottom panel of the machine and the switch behind the drip
tray are in the correct position (see chapter 4.3, image 1 and 2).
2. Make certain that the pump pressure gauge indicates enough pressure.
3. Plug the machine into an electrical outlet. Place the brew lever into the upper position.
4. Turn the machine on by placing the metal switch in the upper position. The green control lamp and the
PID display will come on and a pump noise will be heard. The coffee boiler and the steam/ hot water
boiler are now filled with water simultaneously.
As soon as water is released through the brew group, position the brew lever back downward. If there
is still a pump noise, the filling of the steam/ hot water boiler is still being completed.
Fill Modus (see chapter 5.1)
5. As soon as both boilers are filled with water, the pump will become quiet. The PID display and the
orange control lamp will illuminate. Both boilers are now being heated in succession whereby the
coffee boiler has priority.
6. Continue as described in chapter 5.1
The PRO 700 has a fuse to prevent the machine from overfilling.
It is possible that the machine does not heat up when using it for the first time or when
dispensing large quantities of water through the hot water valve. In this case, please
switch the machine off and on again.
Portafilter, drip tray, drip grid and water tank are not suitable for the dish washer .

6. USE OF THE MACHINE

6.1 Preparation of the machine

The switched off machine is to be placed into operation as follows:
6.1.1

Machine in use with water tank

1.
Fill the water tank, if necessary.
2. Now turn the machine on (the metal switch in the upper position and the left switch behind the drip
3. To use the steam function, press the right switch behin
4. Please wait until the desired coffee-, i.e. steam temperature, has been reached (value indicated on the
PID-display). The machine is ready for steam/ hot water dispension as soon as the PID display
indicates the pre-set nominal temperature of 123°C (factory setting) or the boiler pressure gauge
indicates a value of about 1.0-1.5 bar. In general, the machine will be heated up in about 15 minutes,
depending on the ambient temperature.
1
The machine is now ready for use.
6.1.2

Machine in use with direct water connection

1.
Please make sure that there is always water pressure in the water connection line (indicated on the
pump pressure gauge).
2. Now turn the machine on (the metal switch in the upper position and the right switch behind the drip
3. Continue as described in chapter 6.1.1
Translation of the German original user manual