Connecting The Backup Battery - ADEMCO N7227V5 Installation And Setup Manual

Vista security system installation and setup guide
Hide thumbs Also See for Ademco N7227V5:
Table of Contents

Advertisement

Connecting the Backup Battery

In the event of an AC power loss, the control panel is supported by a backup, rechargeable
Sealed Lead Acid battery. The range of battery sizes recommended are: 12VDC; 4AH-
17.2AH. See "Calculating the Battery Size Needed" earlier in this section. The battery is
installed in the control cabinet.
Making the Battery Connections
1. Use the battery standby formula (above) to select the appropriate battery for the
installation.
Do not connect the battery until all devices have been wired to the control.
2. Attach the red and black battery wires from the control board to the battery as follows:
Red to the positive (+) terminal on the battery.
Black to the negative (–) terminal on the battery.
Use a 4AH battery or larger for UL installations. Calculate the actual battery size needed by
U L
referring to the proper paragraph in this section.
Battery Tests
The standby battery is automatically tested every 4 hours, beginning 4 hours after exiting
Programming mode or after a system reset. In addition, entry into the Test mode causes a
battery test to be initiated.
If the battery cannot sustain a load, a LOW BATTERY message is displayed and, if so
programmed, is reported to the central station. In addition, the connection to the battery is
checked every 3 minutes (a CSFM requirement). If there is no battery detected, or a low-
battery condition is detected, a LOW BATTERY message is displayed and a report is sent to
the central station.
Section 11 – Final Power-Up
11-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ademco vista-10seVista-10se

Table of Contents