Mounting Procedure For 19" Panel Rack Mounting - ABB Relion 670 2.0 IEC Series Installation Manual

Protection and control
Table of Contents

Advertisement

Section 5
Mounting
5.3.2.2
26

Mounting procedure for 19" panel rack mounting

2
1a
IEC08000160 V3 EN
Figure 4:
19" panel rack mounting details
The required torque for the screws is 3.5 Nm.
Pos
Description
1a
Mounting angles, which can be mounted, either to the
left or right side of the case.
2
Screw
3
Washer
1MRK514019-UEN A
3
1a
IEC08000160-3-en.vsdx
Quantity
Type
2
-
8
M4x6
8
M4x6
670 series 2.0 IEC
Installation manual

Advertisement

Table of Contents
loading

Table of Contents