Installation manual
assistance during the testing phase. The manual provides procedures for checking of
external circuitry and energizing the IED, parameter setting and configuration as well
as verifying settings by secondary injection. The manual describes the process of
testing an IED in a substation which is not in service. The chapters are organized in
chronological order in which the IED should be commissioned.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for monitoring, controlling and
setting the IED. The manual also describes how to identify disturbances and how to
view calculated and measured power grid data to determine the cause of a fault.
The service manual contains instructions on how to service and maintain the IED. The
manual also provides procedures for de-energizing, de-commissioning and disposal
of the IED.
The technical manual contains application and functionality descriptions and lists
function blocks, logic diagrams, input and output signals, setting parameters and
technical data sorted per function. The manual can be used as a technical reference
during the engineering phase, installation and commissioning phase, and during
normal service.
The communication protocol manual describes a communication protocol supported
by the IED. The manual concentrates on vendor-specific implementations.
The point list manual describes the outlook and properties of the data points specific
to the IED. The manual should be used in conjunction with the corresponding
communication protocol manual.

Document revision history

Document revision/date
-/May2014
A/June 2016

Related documents

Documents related to REB670
Application manual
Commissioning manual
Product guide
Technical manual
Type test certificate
Ordering form, REB670 Customized
Ordering form, REB670 Preconfigured
History
First release
Second release
Identify number
1MRK 505 302-UEN
1MRK 505 304-UEN
1MRK 505 305-BEN
1MRK 505 303-UEN
1MRK 505 305-TEN
1MRK 505 312-BEN
1MRK 505 313-BEN
Section 1
Introduction
7

Advertisement

Table of Contents
loading

Table of Contents