Sears GT Series Installation Instructions Manual page 9

Geothermal
Table of Contents

Advertisement

13. Reinstall
remaining
bracket
using (2) screws.
See Fig. 18.
14. Connect
vertical
and horizontal
brackets
by installing
(4)
screws.
See Fig. 19.
Fig. 20 - Side and End
Panel Removal
A14036
A14048
Fig. 18 - Reinstalling Bracket
%
%
i¸' _ t! i_i_
A14049
Fig. 19 - Connect Vertical and Horizontal
Brackets
Right-Hand
Unit (GT024-72H*R)
Instructions:
1. Remove and retain end and side panels. See Fig. 20.
2. Disconnect blower motor wiring and ground wire fastened
to blower housing,
See Fig. 21.
3. Remove and retain (4) screws under the blower collar, See
Fig. 22.
[]NIT
DAMAGE
HAZARD
Failure to follow this caution may result in equipment
damage or improper operation,
Air coil is in close proxinfity to the blower. Air coil fins are
easily damaged. Great care must be taken during this step
to avoid coil damage. Shipping cardboard can be used as
protection during blower removal and installation,
A14037
Fig. 21 - Blower Motor Wring & Ground Wire Location
A14054
Fig. 22 - Location of Screws Under the Blower Collar

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt024Gt036Gt048Gt060Gt072

Table of Contents