Preparation For Shipment And Storage - FLIR SeaFLIR II Series Operator's Manual

Table of Contents

Advertisement

Commercial in Confidence
Export Level 2
Issued to: AgustaWestland
4.3

Preparation for Shipment and Storage

It is recommended that when the SGA must be returned for repair, it
should be shipped in the reusable-shipping container provided with the
equipment. Before powering down, engage the SGA into the locked
position.
quantities of shock-absorbent packing material, to prevent damage to the
equipment during shipment and may be shipped via commercial
standards. Cables should be packaged separately in a suitable transport
container able to accommodate the weight of the cable. When returning
the equipment to a FLIR repair facility, a Return Material Authorization
(RMA) should be obtained from FLIR, with an explanation of the reason
or conditions prompting the return shall be included in the shipping case.
Valid on Day of Issue only.
Document will not be updated
All other components can be packaged utilizing ample
CM Ref:4049
71
Uncontrolled : 4256
Retrieval Date:07-Dec-10
Requested by Bower, Richard

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Seaflir iiSeaflir ii-c

Table of Contents