System Installation; System Diagram - FLIR SeaFLIR II Series Operator's Manual

Table of Contents

Advertisement

Commercial in Confidence
Export Level 2
Issued to: AgustaWestland
Voltages exist in the SeaFLIR II Imaging System.
SeaFLIR II Imaging System must be de-energized (TURNED
OFF at Circuit Breaker) before installing or removing.
2.1

System Diagram

The SeaFLIR II Imaging System is to be installed per the respective host
platform alteration or alteration instructions. Figure 2-1 depicts a typical
installation.
Proper grounding of the SeaFLIR II Imaging System must be
accomplished at time of installation into the host platform.
Refer to the FLIR Interface Control Document (ICD),
18400-940. Additional service and installation information
can be obtained by contacting FLIR at (978) 901-8000.
Improper installation of the system will cause display
problems and can damage the system components.
CM Ref:4049
Valid on Day of Issue only.
Document will not be updated
2.

SYSTEM INSTALLATION

WARNING
CAUTION
13
Uncontrolled : 4256
Retrieval Date:07-Dec-10
Requested by Bower, Richard
The

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Seaflir iiSeaflir ii-c

Table of Contents