Installation Checklist - Global American 3307800 User Manual

Table of Contents

Advertisement

3307800
o
Before and during the installation of the 3307800 DO NOT:
Remove any of the stickers on the PCB board. These stickers are required for
warranty validation.
Use the product before verifying all the cables and power connectors are
properly connected.
Allow screws to come in contact with the PCB circuit, connector pins, or its
components.

5.2.2 Installation Checklist

The following checklist is provided to ensure the 3307800 is properly installed.
All the items in the packing list are present
The CPU is installed
The CPU cooling kit is properly installed
A compatible memory module is properly inserted into the slot
The CF Type I or CF Type II card is properly installed into the CF socket
The jumpers have been properly configured
The 3307800 is inserted into a chassis with adequate ventilation
The correct power supply is being used
The following devices are properly connected
o
o
o
o
o
o
o
o
The following external peripheral devices are properly connected to the
chassis:
o
When working with the 3307800, make sure that it is disconnected from all
power supplies and that no electricity is being fed into the system.
Primary and secondary IDE device
SATA drives
Keyboard and mouse cable
Audio kit
Power supply
USB cable
Serial port cable
Parallel port cable
DVI screen
Page 75

Advertisement

Table of Contents
loading

Table of Contents