I Operating - Zodiac Heat Select ZS500 Series Instructions For Installation And Use Manual

Hide thumbs Also See for Heat Select ZS500 Series:
Table of Contents

Advertisement

2.3 I Operating

• Check that there are no tools or other foreign objects in the machine.
• The panel that provides access to the technical section must be put in place.
• Set the valves as follows: valve B wide open, valves A, C, D and E closed.
• An incorrect by-pass setting may cause the heat pump to malfunction.
• Check that the hydraulic corrections are correctly tightened and that there are no leaks.
• Check that the device is fully stable.
• Set the water circulation running.
• Close valve B gradually so that the filter pressure is increased by 150g (0.150 bars).
• Open valves A, C and D fully then valve E by half (the air which has built up in the heat pump condenser and the
filtration circuit will bleed out). If valves D and E are not present, open valve A wide and close valve C by half.
• Connect the power supply to the heat pump.
• If the heat pump is on standby, press
is displayed. A 2-minute timer will start.
• Set the temperature you want ("setpoint" temperature).
After the start-up steps for your heat pump:
• Shut down the water circulation temporarily (by stopping the filtration or closing valve A or C) to check that you
device stops after a few seconds (via the activation of the flow rate controller).
• Reduce the setpoint temperature to below the water temperature to check that the heat pump stops operating.
• Switch off the heat pump by pressing and holding
: water entry valve
: by-pass valve
: water exit valve
: water entry adjustment valve (optional)
: water exit adjustment valve (optional)
for 3 seconds; the splash screen appears for 4 seconds then the home screen
for 3 seconds and check that it stops
.
EN
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents