Sanc40 Cabinet With Plastic Strip - IBM TotalStorage SAN256N Director 2045-N16 Installation And Maintenance Manual

Table of Contents

Advertisement

6. Cut the plastic strap securing the ESD bag to the SANC40 cabinet. Remove and
discard the plastic strap. Remove and save the four plastic corner protectors. Place
the corner protectors in the shipping crate for storage.
Figure 23. SANC40 cabinet with plastic strip
7. Leave the anti-static plastic shipping bag in place on the cabinet until a IBM Field
Service representative, or a certified Third Party Field Service Organization
representative, is present to unpack this equipment. The Field Service representative
will then continue with the unpacking and removal of the protective plastic shipping
bag from the cabinet. Do not discard the plastic bag; place it with the packaging
materials in the event that the SANC40 cabinet should have to be returned to IBM.
Important: When the SAN256N director is shipped in conditions of extreme (high/low)
temperature and/or humidity, allow 24 hours for environmental stabilization of the
SANC40 cabinet and/or cabinet at room temperature. This 24-hour environmental
stabilization period must be accomplished in the room/area where the installation will
take place. The ESD bag/shipping materials must be removed to allow proper
environmental stability prior to the installation of the SAN256N director.
8. After unpacking the SAN256N director, collect and store the all the shipping and
packaging materials, including the shipping crate in the event that the SANC40
cabinet would have to be returned to IBM.
9. Locate the remaining shipping boxes that contain the Software/Firmware Release
CDs, SFPs, cables, Customer's Spares Kit, and other miscellaneous chassis or
cabinet installation parts.
Plastic Strip
ESD Bag
Chapter 3. Installation
31

Advertisement

Table of Contents
loading

Table of Contents