1. Power off the inVSN Enterprise Manager before powering off the SAN256N director.
2. Close all inVSN EM Client applications (File | Exit)
3. Close all inVSN EM Server applications (File | Exit)
4. Set the inVSN EM Workstation(s) AC power On/Off switch to Off
5. Power off the SAN256N by setting the power supply switches to the Off position.
D005

Scheduled power outages

When scheduling computer room power outages, the SANC40N cabinet can just be
powered off. The TCM boards keep all the port specific data stored in the battery-backed
non-volatile memory for up to 10 years. However, the dynamic data will be lost.

Unscheduled power outages

If an unexpected power outage is experienced, the SANC40N cabinet can be left in the
state it was when the power loss occurred. It is recommended to set the AC Power
Supply switches to the 0 (Off) position before power resumes if not an inconvenience or
if time permits.
If the power loss continues past 48 hours, then set the AC Power Supply switches to 0
(Off).
To power off the inVSN EM applications and Workstations with SAN256N director
active:
See the IBM TotalStorage SAN n-type Director Family Enterprise Manager
Installation and Operator Guide (GC26-7720) for the detailed step-by-step power
down procedure.
Attention: Refer to safety notices before starting an installation.
AC power voltages are still present after setting the power
CAUTION:
supply switches to OFF.
The following indications should occur in the SAN256N director:
– Both LEDs on each Power Supply Status Indicator panel should go off.
– All module LEDs should go off; the 16-character display on the TCM should go
blank.
– The chassis upper fan assemblies, side fan assemblies, and power supply fan
assemblies should stop rotating.
Chapter 5. Hardware maintenance procedures