The following steps are to be carried out before initial commissioning:
Plug the cold-device connector of the supplied mains connection cable into the cold-device socket
•
for gas conditioning;
•
Connect power cord to the network;
Switch on power supply.
•
After the end of the lead time, the gas conditioning unit is ready for operation (green LED on the
controller lights up).
Notice
13.1
COOLER CONTROLLER
Display
> 8 °C
After
[> 46.4 °F]
commissioning
(room
temperature)
After about. 10
≤
min.
[≤ 41.9 °F]
Normal operation 5 °C [41 °F]
Notice
26
In the case of long-term measurements with high dust content in the
sample gas, a suitable gas sampling probe to protect the sample line
from clogging must be provided.
LED red
ON (status
alarm)
5.5 °C
OFF
OFF
If a cooler temperature alarm is present, after default setting, the gas
sample pumps are switched off (if available) to prevent the transport of
wet sample gas into the analyzer.
CSS-VC-1.6 | 1.01.03
LED yellow
LED green
Lights up in the
case of an existing
OFF
flow alarm
OFF
ON (cooling)
OFF
ON (cooling)
Status message
Hightemp.: 1
Pump-warn.: 1.2 (when
pump is connected
and configured
accordingly, see
Section 16.2)
OK
OK
www.mc-techgroup.com