ETC ArcSystem Pro One-Cell Series Installation Manual page 10

Table of Contents

Advertisement

ETC Installation Guide
Pro One-Cell
Note:
opening so that the driver and luminaire can be inspected and serviced when needed.
Note:
Note:
national and local codes for electrical equipment.
Pro One-Cell
Make sure that the flexible electrical supply can extend through the ceiling
Use suitable conduit where required by national and local codes.
Drivers may require additional means of securement. Installation must follow all
Page 10 of 29
ETC

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ArcSystem Pro One-Cell Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents