Energetics ET 1070 Assembly Manual page 12

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 3
Step 3 Connecting Arm Assembling
1. Use one 5/16" × 32m/m_Hex Head Bolt (89), 5/16" × 20 × 1.5T_Flat Washer (126) and 5/16" ×
7T_Nyloc Nut (114) to secure the Rod End Bearing(26), which is at the end of Lower Handle Bar (L)
(4), by using 13.14m/m_Wrench (137) and 12m/m_Wrench (136). Repeat the procedure for the right
side.
2. Use 3/8" × 2"_Button Head Socket Bolt (96), 3/8" × 19 × 1.5T_Flat Washer (123) and 3/8" × 7T_Nyloc
Nut (115) to secure Outer Slide (14) on the mainframe by using 13.14m/m_Wrench (137) and
Combination M5 Allen Wrench & Phillips Head Screw Driver (135). Then use 3/8" × 1-1/2"_Button
Head Socket Bolt (95), 3/8" × 19 × 1.5T_Flat Washer (123) and 3/8" × 7T_Nyloc Nut (115) to secure
Inner Slide (18) to Rail Assembly (13) by using 13.14m/m_Wrench (137) and Combination M5 Allen
Wrench & Phillips Head Screw Driver (135).
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents